Requirement
With reference to the ECC subcontrol 2-9-3-3, a periodical test must be conducted at least once every six months in order to determine the efficiency of recovering telework systems backups.
References
- ECC – 2:2024 equivalent: 2-9-3-3
With reference to the ECC subcontrol 2-9-3-3, a periodical test must be conducted at least once every six months in order to determine the efficiency of recovering telework systems backups.
Need help putting this into practice? See our NCA TCC compliance services.
Talk with our team about your framework, your gaps, and the right plan.
Get a demo